Profile Project

Information updated to: 31/08/2016

Project

SMART TUNNEL

Code PON04a2_G
Field/s Smart cities
Description Objectives The project concerns the development of technology for the control and rationalisation of mercantile ship and passenger traffic in port areas, the movement and management of containers, and the movement and management of auto-vessels. The Italian port cities are characterised by high levels of air pollution from the ships at dock and by traffic congestion for vessels which, when exiting the port, transit through urban viability. The topic of logistics in Italian port areas is a central question for the sustainable development of coastal urban areas. Methodology Used The Project focuses on developing and experimenting with forms of the logistical chain in global maritime transport, maximising the security and efficiency of port-retroport-inland terminal corridors, to encourage processes of port regionalisation and to increase the competitiveness of the regional intermodal system. In the field of urban mobility it focuses on more integration of the logistical chain in the urban transport of goods, by making operational models available for the network design of land-side transport activities (inter-modal and co-modal transport), application of Intelligent Transport Systems (ITS) tools for the management of flow of goods and vehicular fleets (optimisation of loads), as well as for the planning of routes (routing). Results expected and first users The key points of the results of the project are: • The intermodality of the systems which manage flow of goods along the logistical value chain, aimed at the optimisation of transport by integrating services of storage and transport in the whole chain of provision, with the aim of optimising load/unload time and operations, to guarantee the quality of the loading and the saturation of the capacity of the vessels and the units of circulation through a combination of "non-intensive" transport acts, which tend to prioritise the saturation of vessels with respect to delivery speed. • The inoperability of the systems which manage flow of information relative to the logistical value chain: founded on the use of immaterial networks, according to "fourth party logistics providing" models and/or models of "e-logistics exchanging", models which, if implemented at the capillary level along the whole logistical supply chain, can contribute to the creation of a sustainable logistical system. Other information Key words: Intermodality, Port Regionalisation, Logistics, "Smart City"
Total cost 10,122,827.52 euro
Public contribution
Total public contribution
6,812,438.33 euro

NOP R&C contribution
6,812,438.33 euro

PAC contribution
0.00 euro

Distribution Advancement of distribution in %
Total amount distributed
4,430,323.47 euro

NOP R&C distributed amount
4,430,323.47 euro

PAC distributed amount
0.00 euro

Legend

Field/s – Indicates the field or fields in which the project has the most relevance. A project may have more than one field. For some projects it is not assigned. The field are the following 8: "Health and wellbeing", "Food", "Energy", "Environment and Ecology", "Transport and Logistics", "Cultural goods and activities", "Social Innovation" and "Smart Cities".

Description – Descriptive summary of project.

Total cost – Total cost of project.

Public contribution – Three elements are reported:

  • Total commitment – total amount admitted to financing, may include more than contribution to be valued on NOP R&C, also on other funds.
  • NOP R&C admitted contribution
  • PAC admitted contribution
  • Contribution with other funds

Distribution – The following elements are reported:

  • Total distributed amount – takes into account the distributed amount considering both NOP R&C distribution and other funds if provided for
  • NOP R&C distributed amount – amount distributed to financing of project to be valued on NOP R&C
  • PAC distributed amount – amount distributed to financing of project to be valued on PAC
  • Amount distributed with other funds – amount distributed to financing of project with other funds

The distributions refer to the date of last update indicated at top.

Type of beneficiary Public commitment for beneficiary
University 1
Public research organisation 1
Large business 1
Non-classified 1
Micro business 1
Total Beneficiaries 5

Università degli Studi di Salerno

Tax File Number: 80018670655
Unique Project Code: D51H12000000005
Location of financial commitments: Campania
Type: University

Presentation date 31/07/2012
Approval date 18/11/2015
Start of activity Expected date
05/11/2012
Effective date
05/11/2012
End of activity Expected date
31/12/2015
Effective date
-
Total cost 2,484,059.00 euro
Public contribution Total
1,987,247.20 euro
Eligible of NOP R&C
1,987,247.20 euro
Distribution Total
1,987,246.61 euro
Amount of NOP R&C
1,987,246.61 euro

Date of last distribution of NOP R&C
-

CNR - Consiglio nazionale delle ricerche

Tax File Number: 80054330586
Unique Project Code: B61H12000510005
Location of financial commitments: Campania
Type: Public research organisation

Presentation date 31/07/2012
Approval date 18/11/2015
Start of activity Expected date
05/11/2012
Effective date
05/11/2012
End of activity Expected date
31/12/2015
Effective date
-
Total cost 1,024,824.05 euro
Public contribution Total
819,859.24 euro
Eligible of NOP R&C
819,859.24 euro
Distribution Total
819,859.24 euro
Amount of NOP R&C
819,859.24 euro

Date of last distribution of NOP R&C
-

Vitrociset S.p.A.

Tax File Number: 00145180923
Unique Project Code: B61H12000500005
Location of financial commitments: Campania
Type: Large business

Presentation date 31/07/2012
Approval date 18/11/2015
Start of activity Expected date
05/11/2012
Effective date
05/11/2012
End of activity Expected date
31/12/2015
Effective date
-
Total cost 2,533,860.00 euro
Public contribution Total
1,496,705.25 euro
Eligible of NOP R&C
1,496,705.25 euro
Distribution Total
748,352.55 euro
Amount of NOP R&C
748,352.55 euro

Date of last distribution of NOP R&C
-

Grimaldi Euromed S.p.A.

Tax File Number: 00278730825
Unique Project Code: B61H12000490005
Location of financial commitments: Campania
Type: Non-classified

Presentation date 31/07/2012
Approval date 18/11/2015
Start of activity Expected date
05/11/2012
Effective date
05/11/2012
End of activity Expected date
31/12/2015
Effective date
-
Total cost 2,400,055.21 euro
Public contribution Total
1,362,607.33 euro
Eligible of NOP R&C
1,362,607.33 euro
Distribution Total
301,851.63 euro
Amount of NOP R&C
301,851.63 euro

Date of last distribution of NOP R&C
-

Tecnosistem S.p.A.

Tax File Number: 01207120633
Unique Project Code: B61H12000480005
Location of financial commitments: Campania
Type: Micro business

Presentation date 31/07/2012
Approval date 18/11/2015
Start of activity Expected date
05/11/2012
Effective date
05/11/2012
End of activity Expected date
31/12/2015
Effective date
-
Total cost 1,680,029.26 euro
Public contribution Total
1,146,019.31 euro
Eligible of NOP R&C
1,146,019.31 euro
Distribution Total
573,013.44 euro
Amount of NOP R&C
573,013.44 euro

Date of last distribution of NOP R&C
-
Axis - Operational objective II - Integrated activities for sustainable development and dissemination of the information society (Go to )
Action Integrated actions of research and competitiveness for sustainable development
Action line Smart Cities (Go to)
Instrument of implementation Smart Cities and Communities and Social Innovation notice (D.D. 84/Ric. 02/03/12) - Smart Cities and Communities projects
NSF - objective Promote local development opportunities through activation of production chains linked to the increase of the quota of energy produced from renewable sources and to energy saving
QR Code for 'http://www.ponrec.it/en/open-data/projects/profile-project/?&ProgettoID=5841'
Copyright © 2011 Ponrec